Outcome

The building is structurally sealed on every relevant access route. No biocides were used. The resident received a brief written report after handover detailing what was done, with recommendations for ongoing prevention.

Work performed

  • Structural inspection of the building and crawl space
  • Exposing and sealing pipe penetrations with fine wire mesh
  • Fine mesh under the roof tiles against entry via the gutter
  • Mechanical removal where needed, without biocides
  • Floor repair on the inside after openings were addressed
  • Written hand-over with prevention recommendations

Want a similar project assessed or carried out? Get in touch.

Have a similar project for us?

Call us on weekdays. You will not get a call centre, you will get an Amsterdammer.

+31 6 498 11 483