← All projects
Amsterdam
Terschellingstraat
A project of several days on site. The work involved a structural inspection, exposing access routes in the crawl space, fine wire mesh under the roof tiles, and floor repair on the inside. No poison, no biocides.
Outcome
The building is structurally sealed on every relevant access route. No biocides were used. The resident received a brief written report after handover detailing what was done, with recommendations for ongoing prevention.
Work performed
- Structural inspection of the building and crawl space
- Exposing and sealing pipe penetrations with fine wire mesh
- Fine mesh under the roof tiles against entry via the gutter
- Mechanical removal where needed, without biocides
- Floor repair on the inside after openings were addressed
- Written hand-over with prevention recommendations
Want a similar project assessed or carried out? Get in touch.